FEASIBILITY STUDY AND PREPARING DETAILED DESIGNS FOR THE CONSTRUCTION OF A NEW STELLING AT PARIKA
Live source healthy
Data last refreshed 02 Sep 2026 05:20 GYT
CDB Guyana Contract Awards
Latest records were refreshed from the official source.
Official Source
- Source
- CDB Guyana Contract Awards
- Refreshed
- 02 Sep 2026 05:20 GYT
- Basis
- Source-backed public record
- Official record
- Open official record
FEASIBILITY STUDY AND PREPARING DETAILED DESIGNS FOR THE CONSTRUCTION OF A NEW STELLING AT PARIKA Winning bid: Antigua/Guyana- Mott MacDonald in association with SRKN’gineering GBP $610,455.80. CDB award document: https://www.caribank.org/sites/default/files/publication-resources/CONTRACT%20AWARD%20INFORMATION%28CONSULTANCY_SERVICES%29%20-%20Parika%20Stelling%20Feasibility%20%281%29.pdf