Procurement of Plant Design, Supply, and Installation of Water Treatment Facilities, Guyana: Lot 1 and Lot 3
Live source healthy
Data last refreshed 02 Sep 2026 05:20 GYT
CDB Guyana Contract Awards
Latest records were refreshed from the official source.
Official Source
- Source
- CDB Guyana Contract Awards
- Refreshed
- 02 Sep 2026 05:20 GYT
- Basis
- Source-backed public record
- Official record
- Open official record
Procurement of Plant Design, Supply, and Installation of Water Treatment Facilities, Guyana: Lot 1 and Lot 3 Winning bid: Action Construction Equipment (ACE) Private JV. Phoenix Projects Private Ltd. - India Lot 1- GYD 757,673,302 and Lot 2- GYD 2,130,097,816. CDB award document: https://www.caribank.org/sites/default/files/publication-resources/CONTRACT_AWARD_INFORMATION%20%28WORKS%29_ACE%20Lots%201%20and%203.pdf